Website design for renovation contractors: portfolios and quote enquiries
Build a renovation portfolio and collect quote details. See how a private job system can track rooms, changes to scope, approvals and handover.
6 min read
In this article
- What is the difference between a gallery and a project page?
- What might a finished project page say?
- What should a tiling form ask compared with a renovation form?
- When should the website connect to a renovation job system?
- How would the crew handle a change on a flat renovation?
- Which search terms go on service and project pages?
- When is one page enough and what affects the quote?
- What should you prepare before launch?
- FAQ
A renovation website should help customers compare their property with work you have completed and send enough detail for an initial estimate. Start with a few well-documented projects, a clear service list and an enquiry form that distinguishes one trade job from a full renovation.
What is the difference between a gallery and a project page?
| Format | What customers learn | When it helps |
|---|---|---|
| Photo gallery | What your finished work looks like | They want to browse before calling |
| Before-and-after pair | What changed in a particular room | You can show the same spot from a similar angle and explain the work |
| Project page with photos and a description | Whether the property condition and scope are similar to theirs | They are choosing a contractor for a larger job or a full renovation |
Pick three projects like the jobs you want to take more often. For each one, record the location, property type, starting condition, your scope and the result. If the photos show plumbing or furniture installed by someone else, spell out your own contribution. Use photos you can publish and keep identifying details such as exact addresses and personal items out of the frame.
What might a finished project page say?
Interior finishing for a 52 m² flat in Vilnius
We started with a partly finished flat. We prepared and painted the walls, tiled the bathroom and fitted skirting boards in the rooms. A separate contractor handled the electrical work.
The photos show the bathroom wall before tiling, the same wall after tiling and a close-up of the corner.
Add a button such as “Tell us about a similar project”. It can open the quote form with “Flat renovation” or “Interior finishing” already selected, so the customer can start describing the job.
What should a tiling form ask compared with a renovation form?
| Job | What to ask up front | What the answer tells you |
|---|---|---|
| Bathroom tiling | Location, approximate wall and floor area to tile, condition of the surface and whether tiles have been chosen | Whether you can take the job and whether photos are enough for an initial assessment |
| Full flat renovation | Location, floor area, current condition, work required and preferred start date | Whether it fits your schedule and what to cover on a site visit |
Ask for one way to get back to the customer. Keep photos and plans optional if you can start with a conversation. After submission, confirm that the enquiry arrived and say when you usually reply.
When should the website connect to a renovation job system?
Customers use the public website to view your services, check past work and request an estimate. A private workspace gives the crew the agreed scope, tomorrow’s tasks and any outstanding decisions. Pick the scope based on where the team is losing time today.
| Setup | When it fits | What to keep together |
|---|---|---|
| Website form that sends email | One contractor takes individual jobs and manages their own diary | The enquiry and the date you need to answer |
| Website and shared project board | A crew works across several sites and needs a list of assignments | Site visits, project stages and next tasks |
| Website and a job system designed for the crew | Several trades, material deliveries and customer decisions have to align at one site | The agreed scope, quote versions, tasks by room, photos and handover notes |
A project can move through Site visit, Quote under review, Scheduled, In progress and Handed over. Use separate task stages such as Ready, In progress, Waiting and Done. For a waiting task, record what it needs, who owns the next action and the date to follow up. The project manager can then see the work that needs attention even when the overall deadline is weeks away.
How would the crew handle a change on a flat renovation?
Suppose a customer requests finishing work for a 52 m² flat. After the visit, the project lead adds the estimate and assigns tasks by room. The tiler can see when the bathroom is due to be ready, and the painter can see which rooms are available to start. Each person has dates and a scope on their phone.
After the visit, the customer asks to change the area of tiling in the kitchen. The lead records the request, notes how it affects the price and programme and attaches the customer’s approval to the revised scope. While waiting for the decision, the kitchen task shows the reason it is on hold and who will follow up. Once approved, the crew has one place to check the latest instruction. At handover, the record holds room photos, completed extras and points to cover on the walkthrough. Keep the photos selected for publication separate from the working site record.
Which search terms go on service and project pages?
“Interior finishing in Vilnius” fits the main page if that is where you work. Give “bathroom tiling” its own service page if customers can book it on its own. A “flat renovation” page should explain how much of the renovation you can take on. Use specific titles for project pages, such as “Finishing a partly completed 52 m² flat”. Link each project to the relevant service so a customer can move from the example to an enquiry.
When is one page enough and what affects the quote?
| Website scope | When it fits | What affects the work |
|---|---|---|
| One page with three projects | You specialise in one type of work or cover one area | Whether photographs and descriptions are ready |
| Separate service pages and a portfolio | You offer individual jobs and full renovations | Project count, photo preparation, editing, different forms and translations |
If you also want a job system, scope depends on user roles, approvals and any integrations, such as sending dates to a shared calendar. The edapi studio can build a public website with your work and enquiry forms and a separate workspace for the crew. To estimate the build, bring one project broken down by stage and an example of how you currently record a change. Website development · Custom internal systems.
What should you prepare before launch?
- Choose three projects of different sizes. For each one, state the starting condition and the work you handled.
- Use a phone to try both the tiling and full renovation forms. Check whether the answers are enough to decide what to do next.
- Create a test project, assign a task and add a change to the estimate. Ask a colleague to find the version the customer approved.
- Review last month’s enquiries. Count the ones that fit the work you want and those that resulted in quotes after a visit.
FAQ
Should I publish a price per square metre?
If it applies to a defined job, explain what is included. For example, say whether surface preparation and materials are separate. For a full renovation, explain what details you need to prepare an estimate.
What if I have no before photos?
Show the finished room from several angles and describe the starting condition. Add a close-up of a joint or detail if it helps customers understand the work you did.
Are Instagram photos enough?
Instagram is useful for sharing new photos. On a website you can connect a project to a specific service, coverage area and quote form. Reuse the photos and add a short description of the work.